Dean's Welding Job Portfolio

Dean’s Certified Welding, Inc. has completed contracts all over the United States, from The West Coast to East Coast, including Alaska and Hawaii. We have welded everything from 1 inch to 22 foot diameter pipe, specializing in large diameter pipe. Dean's Certified Welding specializes in Shielded Metal Arc Welding (SMAW), Flux Core Arc Welding (FCAW), Flux Core Arc Welding with Gas (FCAWG), Gas Metal Arc Welding (GMAW), and TIG in the field working under many different conditions and in all types of open cut pipeline trenches, tunnels and shafts.

 

Large-Scale Projects

Long Beach Reliner

The Second Lower Feeder delivers treated water from the Robert B. Diemer Water Treatment Plant in the city of Yorba Linda to Palos Verdes Reservoir in the city of Rolling Hills Estates. The feeder was constructed in 1967 and is 39 miles long. Dean's finished a reliner with J.F. Shea in long beach at the beginning of spring, 2015. We did the fit-up and welding of the 75" diameter liners.

Lakeview Pipeline (Bernasconi Tunnel)

Dean's Certified Welding recently finished 4,900 feet of 114-inch-diameter steel liner within the Bernasconi Tunnel, for the Lakeview Pipeline/Inland Feeder Intertie. We completed the welding section of this job in March, 2015 with J.F. Shea as the contractor.

Carlsbad Desalination Project

SoCal Pipeline is currently working with KSD (Kiewit Shea Desalination)  on the Carlsbad Desalination Project. The project began mid 2013 and is scheduled to finish in 2015. The $1 billion project includes a 10-mile pipeline through North County. Pipeline installation is complete in both San Marcos and Vista, and will be done in Carlsbad in late spring 2015. The desal plant is projected to meet 7 percent of San Diego County’s demand in 2020.

Twin Oaks to San Marcos Pipeline 3 Reliner

Dean's was awarded the welding contract of 2.5 million dollars in November of 2013. The Pipeline 3 Desalination Relining project includes relining 27,000 feet of existing 72" and 75" with new welded steel liners. Dean's Welding also fit-up and welded 500 feet of 69" outside diameter welded steel pipe at seven separate access portals; Fit-up and welding of 448 feet of 67 ¾" outside diameter welded steel pipe at eight different access portals. Additionally, we replaced 47 feet of 72-inch steel pipe with new 67 ¾-inch outside diameter welded steel pipe. This project was completed ahead of schedule late 2014.

Sweetwater to Lower Otay Reliner

Dean's Welding finished welding the Sweetwater to Lower Otay Reliner by April of 2014. We successfully welded 5.4 miles of 66" diameter pipe. This was a collapsed liner with a full pen seam weld. We successfully fit-up and welded this project in under 5 months. The project consisted of 17 portals where we would install the collapsed liner into the existing CMLC pipe; then weld up the seams and circumferences. Once the welding is complete another company came and poured grout in to the void between the old and new pipe; at which point we welded up several thousand 2" grout plugs.

Seymour Capilano Twin Tunnels Completion Project

Dean's was awarded this contract In 2010 and won the 5 million dollar welding contract.  Dean’s is currently working on the Metro/Vancouver Twin Tunnels Completion Project and is scheduled to finish in fall of 2014. This job had over 3000 ft of shafts and over 15,000 feet of tunnel that is steel lined. This 10 ft diameter pipe ranges in thicknesses from ½” to 2” with 9 different field assembled Tees and crosses. Click to see Seymour Capilano Welding photos.


San Vicente Tunnel

2008-10 Dean’s worked with Traylor/Shea JV on the San Vicente Tunnel in Lakeside, CA. for SDCWA. Dean’s welded the 11 ½ mile 102” diameter steel pipe line consisting of 15/16”-3/8” butt welds to complete this $3.5 million dollar welding contract. Click to see more San Vicente Tunnel Welding Photos.


Arrowhead Tunnels

2008-09 Dean’s worked with Shea/Kenny JV on the Arrowhead Tunnels in San Bernardino, CA for MWD. Dean’s was awarded the $4.4 million contract for the approximately 8 ½ mile tunnel. Dean’s welders completed welding on this 144”-169” diameter steel pipe line with thicknesses varying between lap welds of 5/16”-3/4” and Butt welds ½”-3/4”. Click to see more Arrowhead Tunnel Welding Photos.

 

Lake Hodges Tunnel

2006-07 Dean’s worked with Kiewit Pacific on the Lake Hodges Tunnel in Escondido, CA. This $819,000.00 contract was awarded to Dean’s for SDCWA. This 6300’ tunnel consisted of 1 1/8”-7/8” thick 120” diameter steel pipe. This pipeline was all butt welded and 100% UT tested.

San Diego Pipeline Reliner Projects 3&4

2003-04 Dean’s worked with J.F. Shea on the San Diego Pipeline 3 and 4 Re-liner Project for San Diego County Water Authority (SDCWA) in CA. The scope of work for a re-liner project is much the same as a tunnel project. Pipe sections are brought into the existing line, jacked into place and welded. There are both butt welded circumference seams to be welded as well as a longitude seams the length of the pipe segment. There are numerous grout rings with starts and stops of the new steel pipe lining. This $1.25 million dollar contract was completed by Dean’s welders; welding approximately 6 miles of 96”-72” diameter steel pipe liners.

Plateau Creek Project

2001-02 Dean’s worked with Barnard/Affholder Construction and was awarded the $1.2 million contract for the Plateau Creek project in Grand Junction, CO for Ute Water. This was a 20 mile pipeline, consisting of 48”-54” diameter steel pipe. In the course of the 20 mile line, there were two tunnels, one totaling 3000’ and the other 10,000’.

Eastside Reservoir

1998-99 Dean’s worked with J.F. Shea and was awarded the $275,000.00 contract for Eastside Reservoir Secondary Inlet. Dean’s welded 96” diameter steel pipe in a 3500’ tunnel and 1500’ open cut for MWD.

1997-98 Dean’s worked with Atkinson/Washington/Zachary (AWZ) on the 3800’ P1 Tunnel/Eastside Reservoir project in Hemet, CA for Metropolitan Water District (MWD). This $450,000.00 contract was completed by Dean’s welders; welding 1 3/8” – 7/8” thickness 192” diameter steel pipe. In the course of this tunnel we fabricated from straight pipe 90° elbows in place. This line was all UT tested.

1993-94 Dean’s was awarded the contract with the company Red Path for work completed in Utah for the Strawberry Reservoir. This was a $320,000.00 contract in which Dean’s welded 84” diameter steel pipe for a 750’ shaft & approximately 3500’ tunnel. The pipe sections were all butt welded.

 

Additional Welding Projects

J.F. Shea Brookhurst/OCSD 102” Pipe 2007-09

Kiewit Pacific San Vicente, CA/SDCWA Pump Station108”,96”,66” 2007-09

Steve P. Rados Freeport Water Authority, CA 84” Pipe 2007-09W.A. Rasic Perris Valley Pipeline/MWD 96” Pipe 2007-09

J.W. Fowler Re-liner Pipeline #4/SDCWA 96” Pipe 2008

Kiewit Pacific Diemer Treatment Plant/MWD 144”-24” Pipe 2006-07

CCL San Vicente, CA/SDCWA 66” Pipe 2006

FCI I-15 FWY/San Diego, CA Bridge Crossing 2006

J.F. Shea Advanced WTP/OCSD 96”-18” Pipe 2006-07

Archer Western Rancho Penasquitos /SDCWA 108”-42” Pipe 2005-2007

J.F. Shea Riverside Pipeline 6/MWD 120” Pipe 2005-06

Steve P. Rados Sacramento Force main 66” Pipe 2005-06

Colich & Son’s Lancaster, CA 30” Pipe 2005-06

Kiewit/Vadnais City of Phoenix, AZ 69” Reliner 2004

J.F. Shea Pipeline 3 & 4/SDCWA 96”-72” Reliner 2003-04

J.F. Shea Lake Matthews, CA/MWD Shaft/SS Gates 2003

Kiewit Lake Hodges/CA/SDCWA 48” Pipe 2003

Red Line Colorado 102” Pipe 2003

ASI Main Line Colorado Tunnel Shaft 2003

Kiewit Hollywood Quality/LADWP Pump Station 2002

Kiewit JosephJensen Filtration/MWD 139” Pipe 2002

Steve Bubalo Callegus Water District/MWD 24” Pipe 2002

Vadnais Callegus Water District (3liners) 48”-27” Pipe 2002

Ghilotti Santa Rosa, CA 60” Pipe 2002

Morrison Knudsen San Diego, CA/SDCWA 78”- 48” Pipe 2001

Vadnais Callegus, CA 48” Reliner 2001

Colich Construction Sepulveda/LADWP 96”-69” Pipe 2001

Barnard Grand Junction, CO 54” Pipe 2001

Barnard Owen Valley, CA 60” Pipe 2001

Steve P. Rados Allen McColloch Repair/MWD 96” Pipeline Repair 2000

Elmore Pipe Jacking Alameda Corridor/MWD 84”-54” Pipe 2000

J.F. Shea Mentone/MWD 144” Pipe 2000

Bubalo East Valley Feeder/MWD 54” Pipe 2000

J.F. Shea Secondary Inlet/MWD 96” Tunnel Pipe 1998-99

Steve P. Rados Inland Feeder South/MWD 144” Pipe 1998

Advanco Arrowhead West/MWD 144” Pipe 1998

Atkinson/Washington/Zachary P1 Tunnel/Hemet, CA/MWD 192” Pipe 1997-98

Shank/Balfour/Beatty Arrowhead Tunnel East/MWD 144” Pipe 1997-98

Lundeen Arkansas, Pump Station 3/8”-3” Plate 1997

Kiewit Hawaii 60” Pipe 1997

Colich & Son’s San Diego, CA/Outfall 145 1/2” Pipe 1997

Red Path Utah 84” Pipe 1996

EBY Texas/CO/CA 48”-36” Pipe 1996

Mortensen Minneapolis, MN 96”-54” Pipe 1995

CR Fredrick Novato, CA/Utah 96” Pipe 1995

Advanco Upland, CA/Cal Trans Steel Columns 1994